The Post-Construction Cleaning Checklist Every GC in South Florida Should Use
Post-construction cleaning isn't one job — it's three. Skipping any of them is what produces the smudges, dust streaks, and missed corners that show up on the walkthrough and stall a CO.
Phase 1: Rough clean (after framing and drywall)
Goal: get the site safe and workable for finish trades. This is debris-and-dust removal, not detail work.
- Bulk debris haul-out and dumpster staging
- Sweep all floors (broom or backpack vac)
- Remove sticker residue from windows and fixtures
- Dust down framing edges and exposed mechanical
- Clear vents and exposed ductwork of drywall dust
Phase 2: Final clean (after finishes, before walkthrough)
Goal: make every surface look like the buyer or tenant is the first person to touch it. This is where most cleaning vendors fail because the dust list is longer than it looks.
High surfaces
- Ceiling corners, beams, exposed structural
- All vents, registers, and diffusers (HVAC dust is the #1 callback source)
- Light fixtures, ceiling fans, can-light trim
- Top of cabinets, top of door frames, top of trim
Mid surfaces
- All walls spot-cleaned for drywall mud, paint splatter, handprints
- Switch plates, outlet covers — wiped and edge-detailed
- Cabinet interiors AND exteriors (open every door and drawer)
- Inside of every appliance
- Glass: every window, every shower door, every mirror — interior glass AND tracks
- Window tracks: vacuumed THEN wiped (drywall dust hides here)
Low surfaces
- Tile and grout first wash — grout haze removal where needed
- Hardwood / LVP: dust-mop then damp-mop with manufacturer-safe product
- Carpet: vacuum AND extract if there's any construction dust on it
- Baseboards: every linear foot, edges detailed
- Tile transitions and thresholds
Phase 3: Touch-up clean (after punch-list)
Goal: kill the dust that punch-list trades inevitably re-deposit. Often the difference between a clean walkthrough and a callback.
- Re-dust horizontal surfaces and floors
- Re-clean any surface touched by punch trades
- Glass spot-clean (fingerprints from touch-up painters and electricians)
- Final mop and vacuum
South Florida specifics
Coastal humidity means drywall dust clings differently than it does inland — it gets sticky overnight. Final cleans done more than 48 hours before the walkthrough usually need a touch-up. Schedule the final clean as close to handoff as your CO timing allows.
FAQ
How much does post-construction cleaning cost in South Florida?
Final cleans typically run $0.25–$0.60 per square foot for residential and $0.20–$0.45 for commercial TI, with rough cleans priced per crew-day. Multi-phase projects are usually bid as a package.
Who provides the cleaning supplies?
Your cleaning vendor should bring all supplies, equipment, and PPE. You provide site access, dumpster availability, and water/power on site.
How far in advance should I book?
For residential, 1–2 weeks before your CO target. For commercial TI, lock in the slot as soon as the finish schedule is firm — good post-construction crews book out 2–4 weeks ahead.